A general outline of the work to be carried out under the Contract comprises:1. Mill the existing road surface to ensure 40mm of asphalt is replaced to the general constructed geometry of the road, ensure milling allows for finished surface levels of the works are 5mm above the existing kerbline.2. Record all localities and extents of pavement markings to allow for the reinstatement to AS1742.3. Delivery of Facts Sheets to residents and businesses 3 days before the works, DIPL to supply these Facts Sheets.4. Cold milling of Asphalt works – Profile required depths as per scheduled items.5. Placement of an emulsion tack coat and 7mm stone.6. Placement of a SAMI layer, comprising a spray seal treatment of 10 mm aggregate with a S25E binder. Place and compact any correction course required.
Public award record
Darwin - Stuart Highway Inbound Lanes 19.39km to 19.80km - Remove and Replace Asphalt Surfacing
- Location
- Australia
- Public buyer
- Department of Infrastructure, Planning and Logistics
AWARD DETAILS
- Buyer
- Department of Infrastructure, Planning and Logistics
- State
- NT
- Published
- Contract start
- —
- Category
- Civil
- Value
- $299.9k
- Value type
- AUD
- Procurement method
- Public
- Record updated