The Rottnest Island Authority is seeking offers for the provision of engineering services to deliver preliminary designs for a new central pump station and water storage upgrade described in this Request. The overall project objective is to develop a design for the potable and fire water storage and central pump station to meet the objectives of Rottnest Island Authority (RIA) and consistent with the Rottnest Island Water Supply Infrastructure Renewal Master Plan. A holistic approach is required for the design works as there are several interdependencies that impact the staging and implementation of construction of new infrastructure. Furthermore, existing production and storage equipment is currently the sole source of potable and fire water for the island. Operational outages required for tie ins and construction activities are to be staged to limit the risk of interruption of water supply. The design documentation deliverables from the project will input design and construct tender package for the Sea Water Reverse Osmosis (SWRO) Plant upgrade. The RIA will require further engineering and technical support through the whole project lifecycle to ensure that water production, storage, treatment, and transfer objectives are achieved.
Public award record
Central Pump Staton and Water Storage Upgrades
- Location
- Perth Metropolitan
- Public buyer
- Rottnest Island Authority
AWARD DETAILS
- Buyer
- Rottnest Island Authority
- State
- WA
- Published
- Contract start
- —
- Category
- Urban design and engineering service - (100%)
- Value
- $117.1k
- Value type
- (Estimate)
- Procurement method
- Limited Sourcing
- Record updated