The overall scope of the project is to provide the PTC building with renewed HV electrical infrastructure, renewed LV electrical main switchboard infrastructure and associated communications, controls, and monitoring to enable the following project Objectives: New HV / LV switch rooms compliant to Australian standards. New HV vacuum type switchgear to replace aged oil filled switchgear. New HV / LV dry type transformers to replace existing oil filled transformers. New LV main switchboard to replace existing aged basement level non-essential and essential main switchgear. Provisions for the connection of the RSR Project.New sub-main cabling infrastructure running between the building main LV switchboard (BMSB) and any sub-distribution boards currently served using MIMS type cabling from the BMSB.Safe and compliant maintenance switching operations.Improved maintenance access to equipment.Improved power control to the PTC building when switching is performed and the minimisation of power loss to the building when shutdowns are undertaken as far as is practicable.Improved ability to incorporate whole-of-building temporary generation when required.
Public award record
Design and Construction Support - PTA Electrical Supply Upgrade
- Location
- Perth Metropolitan
- Public buyer
- Public Transport Authority
AWARD DETAILS
- Buyer
- Public Transport Authority
- State
- WA
- Published
- Contract start
- —
- Category
- Professional engineering services - (100%)
- Value
- $929.5k
- Value type
- (Estimate)
- Procurement method
- Panel PTA190058 - Engineering Assurance, Design and Investigation Services Panel
- Record updated