Quote based on the below assets for disposal Malaga DC: Assets for Disposal TOTAL of 2,368 Rack Units of equipment is anticipated for disposal Murray Street DC: Assets for Disposal TOTAL of 1,309 rack units of equipment is anticipated for disposal. Service: Decommissioning and Logistics (estimated cost per hour ~$100) Estimate of hours for technicians to provide onsite decommissioning of ICT Equipment to be disposed on. covering both DC1 and DCM sites. ? TOTAL ~1155 assets (3,677 Rack Units) plus sundries, cables, ext. ? TOTAL ~7,000HDD (Maximum Quantity to be included on estimate) Service: Decommissioning and removal (Overtime Surcharge) (estimated cost per hour ~$100) Provision to be made for the worst case scenario where all assets need to be relocated at the last minute resulting in extensive overtime labor rates to complete work outside of normal hours of operation. The worse case scenario is defines as 100% of the estimated hours are required to be scheduled outside of normal business hours. These hours are provisional in nature, and are only requested in the quote in the extreme event that the data Centre needs to be decommissioned at a rapid rate. Service: Recycling IT Equipment Only (Scheme Items Accepted - $0.31c/Kg) Malaga DC ? DH1: 1,313 Rack Units ? DH4: 1,055 Rack Units Murray Street DC: ? DH2 1,309 Rack Units ? TOTAL: ~3677 Rack Units. A total estimate of 43,391 KG of equipment is anticipated Service : Shredding of a HDD with a serialized report ? ($4.67/HDD) Physical destruction of the following product media by shredding, Estimated quote of ~7000 X Hard drives Service: It Asset Disposition report. ? A comprehensive IT asset Disposition report to be provided at the conclusion of the work. Service: Monthly Secure storage solution per 3.0 X 6.0 = 18sqm Large Storage unit. Commercial secure storage locker to be quoted in the event that assets need to be collected over a shorted than anticipated period. This countermeasure can be called on to provide additional peach of mind should the project deem it necessary to arrange a secure overflow storage for data bearing assets immediately after decommissioning to be held for a period prior to assets being processed through the TGR Canningvale facility. Quoted price is per month per secure storage unit required 3.0 X 6.0 = 18sqm Large Storage unit.
Public award record
HealthNext Program HealthNext Total Green CUAWAS2016 Disposal of Assets in DC1 + DCM
- Location
- Perth Metropolitan
- Public buyer
- Health Support Services
AWARD DETAILS
- Buyer
- Health Support Services
- State
- WA
- Published
- Contract start
- —
- Category
- Management advisory services - (50%)
- Value
- $258.7k
- Value type
- (Fixed Price)
- Procurement method
- CUA CUAWAS2016 - Waste Disposal and Recycling Services Common Use Arrangement (CUA)
- Record updated