Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake Balustrade Height Extension Works at Hampton Senior High School. The works include design, fabrication and installation of balustrade including mesh infill panels to the full length of top-level balcony, Block D from D30, D31, D32 (Doe BCA Map) on the north facing side of the school including returning to the lift shaft, and the width of the highest stair landings on both ends of the north facing side. The balustrade will remove the risk of the existing balcony being used as a step and be carefully planned to mirror the existing balustrade located within Block E.
Public award record
Hampton Senior High School Balustrade
- Location
- Perth Metropolitan
- Public buyer
- Programmed Facility Management
AWARD DETAILS
- Buyer
- Programmed Facility Management
- State
- WA
- Published
- Contract start
- —
- Category
- Building and facility maintenance and repair services - (100%)
- Value
- $64.6k
- Value type
- (Fixed Price)
- Procurement method
- Limited Sourcing
- Record updated