Public award record

Design and Construction of New Floating Pens at Carnarvon Boat Harbour

Location
Gascoyne
Public buyer
(inactive) Department of Transport
AWARD DETAILS
Buyer
(inactive) Department of Transport
State
WA
Published
Contract start
—
Category
Marine construction services - (100%)
Value
$2.1M
Value type
(Fixed Price)
Procurement method
Open Tender
Record updated
PUBLIC RECORD

The WUC includes but is not limited to, the following: Design, construction, management and supervision of the WUC for a new floating boat pen system and associated infrastructure at the Carnarvon Boat Harbour;Preparation and submission of management documentation, design documentation and the like in accordance with this Specification;Demolition of existing Shore Pens numbers 1 and 2, including disposal of existing abutment, walkway and mooring piles, and, undertaking a seabed clean-up which includes removal of an adjacent submerged walkway remnant;Reinstatement of the rock revetment to the extent indicated on the drawings;Full extraction (where possible), removal and disposal of existing steel Shore Pen piles;Removal of existing services on shore pens 1 and 2, such as potable water, electrical final sub-circuits and cable pathways back to existing shore pens distribution board; Design, supply, certification and installation of new piles;Design, supply and installation of high-density polyethylene (HDPE) sleeves to piles;Design, supply, fabrication and installation of pontoon walkways and fingers, fender system and associated fittings and fixtures to form walkways and pens;Design, fabrication and installation of a new access gangway, to fit with the new floating pen system; Design, supply, fabrication, installation and commissioning of services (electrical, potable water) to all berths including new service pillars, fire hose reels and cabinets, fire hydrants, fire alarms and a new distribution board adjacent to the new jetty abutment;Supply and install electrical infrastructure to provide power to a new Jetty distribution board adjacent to the new jetty abutment from the existing Land Backed Wharf switchboard;Submit and complete all relevant notices and certificates as required by Energy Safety and the Inspecting Authority; Supply and installation of signage;Onshore works including stairway, handrailing, fences, gates, lighting, abutment for gangway, earthworks and roadworks in vicinity of abutment; andPreparation and supply of an Operation and Maintenance Manual (including as-constructed documentation) at the completion of the new floating system or otherwise as agreed with the Superintendent.