A general outline of the work to be carried out under the Contract comprises of bituminous repairs of existing Roads and Highways by Pothole Patching only.The contractor will only do Pothole Patching and it is anticipated that the maximum asphalt tonnage the contractor will place in a day to be 4 tonne.Contractors with Konect capacity shall be required to use the electronic recording and management system as part of this contract. The contractors that do not have Konect are required to maintain a daily logbook of the repairs.
← Back to public awards
NT · PUBLIC AWARD
Darwin Region - Rural Roads Bituminous Pavement Pothole Repairs for a Period of 4 Months
Australia
Department of Infrastructure, Planning and Logistics
AWARD DETAILS
- Buyer
- Department of Infrastructure, Planning and Logistics
- State
- NT
- Published
- Contract start
- —
- Category
- Civil
- Value
- $428.2k
- Value type
- AUD
- Procurement method
- Selected
- Record updated