Public award record

PTA250075 Public Transport Operations Control Centre (PTOCC) Stage 3 Design and Fit-Out, Levels 1 to 3

Location
Perth Metropolitan
Public buyer
Public Transport Authority
AWARD DETAILS
Buyer
Public Transport Authority
State
WA
Published
Contract start
—
Category
Heavy construction services - (100%)
Value
$7.2M
Value type
(Estimate)
Procurement method
Open Advertisement
Record updated
PUBLIC RECORD

Background The Public Transport Operations Migration (PTOM) project forms part of the High-Capacity Signalling (HCS) programme of works to accommodate critical infrastructure and personnel to manage the day-to-day operations of Perth’s expanding public transport network. The PTA has constructed a five-storey building, Public Transport Operations Control Centre (PTOCC) that will accommodate the following: Network Control Centre (NCC)Central Monitoring Room (CMR)Network and Infrastructure (N&I) The PTA adopted a staged approach to building and fit-out of the PTOCC with the following stages already completed: Stage 1a – PTOCC base building. Completed in December 2023Stage 1b – Levels 4 & 5 fit-out. Completed in July 2024Stage 2a – Ground Level offices fit-out. Completed in December 2024Stage 2b – Level 1 interim NCC fit-out. Completed in March 2024 As part of the ongoing fit-out, the next, and final stage, of the new PTOCC building, the PTA has a requirement for new functions and modifications to existing functions on levels 1 to 3, including but not limited to, new offices, training rooms, comms and electrical distribution, heating and ventilation and fire services. Stage 3a – Levels 2 & 3 fit-out. Target completion date June 2026Stage 3b – Level 1 NCC fit-out. Target completion date August 2026Stage 3c – Level 1 CMR fit-out. Target completion date December 2027 Refer to Book1 and Book4 for comprehensive specifications and additional details