The objective is to provide enhanced visitor experiences with improvements to visitor accommodation units on the island. To implement initiatives outlined in Rottnest Island Management Plan RIMP 2020-24, a select number of accommodation units in South Thomson bays have been selected for refurbishment. Units 212 to 223 were refurbished in 2020. Pricing for the refurbishment of the remaining units in South Thomson has been received and an evaluation report has been finalised. The RIA has recently appointed a head contractor, Programmed Facility Management for this package of works. A brief summary of the scope of works is as follows: a. Demolition including Removal of Asbestos identified in flooring to full extent of accommodation unit where identified. b. Bathroom ? refurbishment including cabinetry, tiling, fittings and fixtures c. New Bathroom and Toilet Floor Slabs where required, d. Kitchen ? refurbishment including cabinetry, equipment, appliances, fixtures and fittings e. Replace bedroom/living area cabinetry f. Replace external windows g. Replace cork flooring with new timber look vinyl plank flooring including floor preparation as required for new floors h. Replace lighting/ switches and ceiling fans, noting existence of asbestos in some elements of the accommodation unit. USB outlets to be installed to all accessible GPO?s. i. Smoke Detector Modification Works j. Procurement of New FF&E as per FF&E schedule k. Water pipework upgrades l. Upgrade of Courtyards
Public award record
Request for Project Management/ Superintendent Services
- Location
- Perth Metropolitan
- Public buyer
- Rottnest Island Authority
AWARD DETAILS
- Buyer
- Rottnest Island Authority
- State
- WA
- Published
- Contract start
- —
- Category
- Project management - (100%)
- Value
- $67.5k
- Value type
- (Estimate)
- Procurement method
- Limited Sourcing
- Record updated