A general outline of works includes but not limited to:> Repairs of sealed roads pavements including:o Stabilisation of pavement, where applicable.o Bitumen sealing of roads> Maintenance of drainage and batter structures> Maintenance of unsealed roadsBelow are project specific requirements:Arnhem Highway - 4 locations( Ch 28.13 to 28.50: Chl34.95 to Chl35.29: Ch205.19 to 205.46 andCH 206.81 to 207.04) - Rehabilitation MethodoloevDisaster Event AGRN 1269 - 31UProcurement Operations Location 1: CH 28.13 to 28.50Road length = 370mPavement and Shoulder width = 9mAnticipated base coarse = Gravel 150mm Location 2: Chl34.95 to Chl35.29Road length = 340mPavement and Shoulder with = 9mAnticipated base coarse = Gravel 150mm Location 3: Ch205.19 to 205.46Road length = 270mPavement and Shoulder with = 9mAnticipated base coarse = Gravel 150mm Location 4: 206.81 to 207.04Road length = 230mPavement and Shoulder with = 9mAnticipated base coarse = Gravel 150mm Works to be compliant to DLI Standard Specification for Roadworks V 5.4 - March 2024Standard Specification for Roadworks v5.4Hold and Witness points applyEnvironmental Plan not required, however Standard Specification for Environmental Managementapplies https://dipl.nt.gov.au/infrastructure/sDecification-services/technicalspecifications/environmentaj-managementLocalised Survey - Survey the repair patch including 50m on both ends of the patch and width to include10m on both side from the end of the shoulders. Provide a repair path design drawing with a longitudinaldesign (horizontal and vertical geometry) and cross sections at 20m intervals (Cross fall) replicate theexisting general constructed geometry of the existing road surface, correct depressions and out of shapeareas. Allow for level checking.Remove and pulverised 150mm pavement, incl seal road base and shoulder base course. Stockpile andreuse as Stabilised Sub-base = 9m wideRemove 200 mm Subgrade = 9m wideEvaluate Subsurface conditions, if subgrade comply to earthworks materials for standard fill, compact thematerial below the subgrade surface. #Place 150mm Pulverised Gravel as Sub-base and stabilise with 3% cement and compact to 98% relativecompaction.Import FCR complying to Table - Fine Crushed Rock Particle Sizes and Table - Fine Crushed RockProperties in the finished condition.Place 200 mm FCR pavement and shoulder and compact to 100% Dry Density Ratio. Grade drainage tothe outside batter.Spray Seal two coat S10E with 14mm and 7mm aggregate.
Public award record
Darwin Region - Repair and Maintenance of Pavements and Drainage due Disaster event (AGRN 1269 - 31U) along Arnhem Highway ( 4 x locations)
- Location
- Darwin, Palmerston, Litchfield
- Public buyer
- Department of Logistics and Infrastructure
AWARD DETAILS
- Buyer
- Department of Logistics and Infrastructure
- State
- NT
- Published
- Contract start
- —
- Category
- Civil
- Value
- $2.6M
- Value type
- AUD
- Procurement method
- Selected
- Record updated