Procurement of Fremantle Hospital (FH) to update F, O and Q Block BAS2800+ to EcoStruxure Building Operation Building management control. The BAS 2800 direct digital control outstations have well exceeded their useful lifespan. The BMS in its current status presents an unacceptable risk to the hospital as system failure both minor and catastrophic can be expected rather than anticipated. Maintaining consistent reliable and trustworthy operation from a system that was installed over 20 years ago is an unrealistic expectation. Schneider Electric (Australia) Pty Ltd provides specialist services to Fremantle hospital for its fitted Building management system (BMS). The EcoStruxure Building Operation Building management control is not compatible with other vendor outstation controllers. The Procurement of upgrading the BMS control, outstations in the selected buildings is based upon risk and change in clinical use. O Block ? Houses site emergency generation and HV switch gear. Additionally, the emergency power management load shed system if contained within this buildings BAS 2800+. F Block ? The clinical services have changed in this building and now house, Day Procedure Unit for bladder and gynaecological services. Electroconvulsive therapy (ECT) procedure unit used to treat certain psychiatric conditionsGeriatric Outpatient Clinic to be housed in 1st half of 2022. Patient equipment centre.Finance (revenue)18 Bed patient ward to be renovated in 2022/23. Clinical service not yet defined. Q Block ? Houses Boiler plant and water treatment equipment
Public award record
Fremantle Hospital (FH) F, O and Q Block BAS2800+ to EcoStruxure Building Operation Upgrade
- Location
- Perth Metropolitan
- Public buyer
- South Metropolitan Health Service
AWARD DETAILS
- Buyer
- South Metropolitan Health Service
- State
- WA
- Published
- Contract start
- —
- Category
- Building maintenance service - (100%)
- Value
- $174.2k
- Value type
- (Estimate)
- Procurement method
- Other Panel - HSS304918
- Record updated