Geotechnical Engineering Support - Inner Armadale Line Level Crossing Removal

Location
Perth Metropolitan
Public buyer
Public Transport Authority
AWARD DETAILS
Buyer
Public Transport Authority
State
WA
Published
Contract start
—
Category
Professional engineering services - (100%)
Value
$219.9k
Value type
(Estimate)
Procurement method
Panel PTA190058 - Engineering Assurance, Design and Investigation Services Panel
Record updated
PUBLIC RECORD

Due to the high-risk nature and significant amount of piling works required on the LXR and BRE project it has been identified that OMTID need to engage a suitably experienced Geotechnical Engineering expert to monitor the progress and practices of the ALUA and Metconnx teams while over 1500 piles are installed. Due to the short-term nature of this role and the level of expertise required this cannot be readily filled via a staff position. The works will be over an approximated 6-month period with an initial ramp up and ramp down in months 1 to 2 and 5 to 6 as the piling works commence and are completed. Over this period, it is expected the Geotechnical Engineer will be utilised on a 75% basis over a 5-day working period. The contractor will be based on site with the contractor however may need to attend meetings in the OMTID offices and report back to the OMTID team. This is for short term service coverage which requires a significant amount of experience and expertise that is not readily available within the exiting team nor can it be recruited for easily in the market. This recruitment will require a specialist Geotechnical Engineer with a minimum of 20 years’ experience and previous experience working in the PTA systems. As this position is only required for the period piling works are being undertaken, it is not expected this role will be required for greater than 9 months. This procurement is due to the high-risk nature of the works being performed to provide an extra level of assurance to the OMTID technical team and PTA that works have been undertaken in accordance with the correct methodology for CFA and Monopile piling works.