Bridges 1324 & 1499: Replace Protective coating on LHS and RHS Guard railingReplace Protective coating to Bridge Bearings on Abutments and Piers.Replace Protective coating on Bridge 1324 Expansion Joint 2 (Western End).Expansion Joint 2 (Western End) Crack Repair and Bolt Tightening. Expansion Joint Compression Seal Replacement at Bridge 1324 Abutment 1 (Western End).Expansion Joint Replacement at Bridge 1499 Abutment 2 (Eastern End).Anchorage Cap Replacement.Rock Protection Repair to Abutment 2.Installation of Anti Dust Skirts to Pier Bearings.Cleaning of PSP lighting.Concrete Patch Repair
Public award record
Structure No 1324 and 1499 Windan Bridge and Eastern Approach - Graham Farmer Fwy SLK 3.54 over Swan River ? Superstructure Repairs
- Location
- Perth Metropolitan
- Public buyer
- Main Roads Western Australia
AWARD DETAILS
- Buyer
- Main Roads Western Australia
- State
- WA
- Published
- Contract start
- —
- Category
- Bridge construction and repair service - (100%)
- Value
- $2.1M
- Value type
- (Estimate)
- Procurement method
- Panel MRWA009816 - Panel Contract for the Maintenance of Road Related Structures within Western Australia
- Record updated