The Public Transport Authority (PTA) is currently constructing the Thornlie-Cockburn Link (TCL) project which will be an extension of the existing Thornlie rail line through to Cockburn Central Station on the Mandurah line. The proposed TCL line is 14.5km in length and will be located in the existing Arc Infrastructure freight rail corridor. The TCL project includes construction of new stations at Nicholson Road and Ranford Road, as well as station upgrades at Cockburn Central Station and Thornlie Station. New bridges and modifications will also be required at Canning River, Nicholson Road, Ranford Road and Karel Avenue. PTA is required to engage a consultant to prepare the Ranford Road Station Ongoing Site Management Plan as required by MS1114 Condition 10-4. Condition 10-4 of MS1114 reads: “To demonstrate compliance with Condition 10-2, prior to operation of the proposal, the proponent shall prepare and submit to the satisfaction of the CEO an Ongoing Site Management Plan”. Under Condition 10-5 of MS1114 it is also required that the OSMP is endorsed by a MAR and prepared in accordance with DWER’s contaminated site guidelines. Upon completion of the OSMP, the PTA will provide the Plan to the CSA for review and preparation of a MAR.
Public award record
Ranford Road Ongoing Site Management Plan - Thornlie-Cockburn Link
- Location
- Perth Metropolitan
- Public buyer
- Public Transport Authority
AWARD DETAILS
- Buyer
- Public Transport Authority
- State
- WA
- Published
- Contract start
- —
- Category
- Environmental management - (100%)
- Value
- $70.3k
- Value type
- (Estimate)
- Procurement method
- Panel PTA180011 - Public Transport Authority Contaminated Sites Panel Contract
- Record updated