The Public Transport Authority?s (PTAs) Office of Major Transport Infrastructure Delivery (OMTID) Branch is responsible for the delivery phase of the METRONET transport related Infrastructure Projects. There are various projects currently in, or transitioning, the Delivery phase. The METRONET rail projects; Victoria Park-Canning Level Crossing Removal and Byford Rail Extension require Coordinating Project Engineer (CPE) services within the respective Project Engineering Teams. A total of two (2) CPEs total are required to represent the PTA as accountable party for the coordination and integration of technical and engineering requirements on the following Projects: Victoria Park-Canning Level Crossing Removal; and Byford Rail Extension Project
Public award record
Provision of the Services of Coordinating Project Engineers
- Location
- Perth Metropolitan
- Public buyer
- Public Transport Authority
AWARD DETAILS
- Buyer
- Public Transport Authority
- State
- WA
- Published
- Contract start
- —
- Category
- Professional engineering services - (100%)
- Value
- $1.5M
- Value type
- (Estimate)
- Procurement method
- Open Advertisement
- Record updated