To provide detailed design with specification for the boiler to be installed, as well as any works required. Design and documentation of the new procured modular steam boilers to replace Boilers within the Q Block plant room Design and documentation of all systems to integrate the new boiler plant into the existing site infrastructure. Documentation of the Scope of Works for gas supply modifications, RO water feeds and electrical supplies to support the new boiler plant.
Public award record
Fremantle Hospital Q Block boiler replacement detailed design
- Location
- Perth Metropolitan
- Public buyer
- South Metropolitan Health Service
AWARD DETAILS
- Buyer
- South Metropolitan Health Service
- State
- WA
- Published
- Contract start
- —
- Category
- Mechanical drawing - (100%)
- Value
- $123.6k
- Value type
- (Fixed Price)
- Procurement method
- Limited Sourcing
- Record updated