Work comprise of reformation and re-compaction of shoulders, both sides, according to the REPAIR TYPE'S;TYPE 1 REPAIR – Reformation and Re-compaction of Shoulders:Top up shoulder with 100mm Type 3 material.Rip, pre-wet and pre-mix material to OMC, and re-compact shoulder pavement to 95% MMDD at 150mm depth and 0.5m wide (horizontally).Make allowance for gravel material outside the shoulder width to establish a 1 in 4 batter as a minimum.Trim and finish.Remove gravel material from the sealed surface with a power broom.Maintain a gravel free asphalt surface during construction to uphold cyclist safety.TYPE 2 REPAIR - Reformation and Re-compaction of Shoulders:Top up shoulder with Type 3 material, 100mm next to the cycle path surface that reduce gradually in thickness to match existing batter level at 0.6m width (horizontally).Rip, pre-wet and pre-mix material to OMC, and re-compact shoulder pavement to 95% MMDD at 150mm depth.Trim and finish.Remove gravel material from the sealed surface with a power broom.Maintain a gravel free asphalt surface during construction to uphold cyclist safety.The workspace on the cycle path is limit and suitable for smaller plant.Note: The cycle path must remain open to cyclists at all times, so arrange traffic management to provide early warning and a safe pathway to cyclists.Note: Environmental restriction are in place, witness Environmental Management Clause.
Public award record
Darwin Region - Pinelands - Cycle Path Shoulder Repairs From Mcmillans Road to Wallaby Holtze Road
- Location
- Australia
- Public buyer
- Department of Infrastructure, Planning and Logistics
AWARD DETAILS
- Buyer
- Department of Infrastructure, Planning and Logistics
- State
- NT
- Published
- Contract start
- —
- Category
- Civil
- Value
- $100k
- Value type
- AUD
- Procurement method
- Public
- Record updated