Programmed Facility Management Pty Ltd (PFM) on behalf of Department of Finance (DOF) and Department of Education are seeking quotes from suitably qualified and experienced contractors to undertake New Bore Works at Girrawheen Senior High School. The work shall include but not be limited to: Construction, development, and testing of a new bore. The supply and installation of a new submersible pump and associated pipework and fittings as specified and shown on the Drawings.The supply and installation of an electrical cubicle including all electrical equipment as required for the operation of the pump. The supply and installation of power line from main switch board to the new bore pump electrical cabinet.The supply and installation of a new controller into the existing cubicle.Investigation on the existing mainline to confirm the characteristics of the existing mainline including materials, size, etc prior removal of the mainline.Cut and cap and removal and disposal of the existing mainline as indicated.The supply and installation of new DN160, PE100 PN12.5 mainline including conduit and draw wires and connection to the existing mainlines.Backfill, compact and level disturbed surface.Flush out and test and commissioning of all works.Provide project completion documentation and backup during DLP.
Public award record
Girrawheen Senior High School New Bore
- Location
- Perth Metropolitan
- Public buyer
- Programmed Facility Management
AWARD DETAILS
- Buyer
- Programmed Facility Management
- State
- WA
- Published
- Contract start
- —
- Category
- Building and facility maintenance and repair services - (100%)
- Value
- $232.8k
- Value type
- (Estimate)
- Procurement method
- Limited Sourcing
- Record updated