Public award record

Civil Design - APA Infrastructure Limited Easement and Track Access - Kenwick Freight Facility Project

Location
Perth Metropolitan
Public buyer
Public Transport Authority
AWARD DETAILS
Buyer
Public Transport Authority
State
WA
Published
Contract start
—
Category
Professional engineering services - (100%)
Value
$299.1k
Value type
(Estimate)
Procurement method
Panel PTA190058 - Engineering Assurance, Design and Investigation Services Panel
Record updated
PUBLIC RECORD

As part of the Kenwick Rail Freight Facility programme of works there remains a requirement to design and construct a Civil Works Package. The PTA seeks the provision of Works, including (but not limited to): To design the Access tracks to turnouts and the APA easement drainage solution in accordance to the Principal's Project Requirements and Terms and Conditions of the Contract.The scope of works in summary is to deliver the following: Review of all existing site and technical information including As Constructed Surveys of the Site services relevant to the scope of Works;Undertaken As Constructed survey of each location including Access track and APA easement to inform the design process;Underground Services identification as determined as required by the Contractor;Design of the access tracks to turnouts meeting Arc, APA and BP requirements;Design of the drainage solution to the APA easement;Delivery of the 100% and IFC design to the Arc General Requirements;Coordinated design reviews including Interdisciplinary Checks, Interdisciplinary Reviews;Arc and APA design review meetings (one per each design phase in addition to kick off meeting);BP design review coordination;Deliver the Engineering assurance deliverables in accordance with Engineering Management for Projects (EM4P) unless amended by this Scope of Works and Specification document;Acceptance of the design drawings by PTA, Arc, APA and BP;Load assessments on the APA and BP pipes for each access track location;Independent Design Verification and Validation (undertaken by another Sub Consultant);Construction Site Support including responses to Request for Information (RFI); andDelivery of the As Built design drawings to the Arc Requirements taken into account all RFIs and NCRs.