Public award record

Protection Officer Services for C-Series Routine Testing

Location
Perth Metropolitan
Public buyer
Public Transport Authority
AWARD DETAILS
Buyer
Public Transport Authority
State
WA
Published
Contract start
—
Category
Security and personal safety - (100%)
Value
$246k
Value type
(Estimate)
Procurement method
Limited Sourcing
Record updated
PUBLIC RECORD

Under the METRONET Railcar Procurement Project (“Project”) the Public Transport Authority of Western Australia (“PTA”) has engaged Alstom Transport Australia Pty Ltd (“Alstom”) for the design, manufacturing, testing and commissioning of 41 x 6-car Electric Multiple Unit (“EMU”) trains known as the C-Series. Alstom will also be undertaking the design, manufacturing, testing and commissioning of 2 x 3-car Diesel Multiple Unit (“DMU”) trains to replace the ageing Australind service. Furthermore, under the scope of the Project, the PTA will also be constructing new railcar maintenance facilities at Bellevue (“Bellevue Depot”) and making various infrastructure modifications at the existing Nowergup Depot. The PTA and Alstom will be implementing an extensive testing and commissioning regime for the new EMU railcars to ensure that they are safe to carry passengers and able to provide the required level of service to the Transperth network. This will include static testing and commissioning at the Bellevue High Voltage Testing Facility, instrumentation testing at Nowergup Depot, and dynamic testing at various locations including on the PTA mainline track. To facilitate the mainline testing and commissioning activities, the Project, in conjunction with Alstom, is planning to establish testing worksites at specified locations along the rail network using a Track Occupancy Authority (“TOA”) governed by the PTA’s Safeworking Rules and Procedures. It is anticipated that these TOAs will primarily occur during the existing Network & Infrastructure (“N&I”) maintenance windows outside of the regular passenger service timetable which typically occurs during nights. To support the Project, primarily in the routine testing and commissioning of the EMU railcars (but also potentially including the DMU railcars, Bellevue Depot construction, Nowergup Depot works, and other works by the PTA or its contractors requiring rail safeworking services) the PTA will require the services of appropriately experienced and qualified Protection Officers. This is anticipated to predominantly include services of a Level 3 Protection Officers (“PO3”), with Pilot experience, however the PTA may also require the services of Level 2 (“PO2”) and Level 1 (“PO1”) Protection Officers as well. Definitions used in this Contract in relation to rail safeworking are as per those defined in the latest version of the PTA’s Procedure 9100-000-007 - Safeworking Rules and Procedures which is available online and can be provided upon request. Acronym / Term Definition PTA Rail Network Consists of the Fremantle line, Midland line, Armadale/Thornlie line, Yanchep line, Mandurah Line, City-Claisebrook, Airport line, and any extensions or modifications made by the PTA from time-to-time. Rail Corridor The land on which a railway is built, comprising all property between property boundaries/fences, or from the nearest rail in each direction for the distance specified by the Access Provider. OLE Overhead Line Equipment PO1 / PO2 / PO3 Protection Officer Level 1 / Level 2 / Level 3 SW Supervised Worker PRES Person Responsible for Electrical Safety VOC Verification of Competency TAP Track Access Permit TOA Track Occupancy Authority ASB Absolute Signal Blocking RIW Rail Industry Worker eTAS Electronic Track Access System – The PTA’s system for issuing and managing track access. ePAS Electronic Permitting Administration System – The PTA’s system used to manage permits to work and overhead isolations on the PTA rail network. ONRSR Office of the National Rail Safety Regulator PPE Personal Protective Equipment Pilot / Piloted A Competent Worker, who accompanies, directs and advises Rail Traffic Crews; or To direct or guide Rail Traffic Crews and tell them about local conditions and operating restrictions on Running Lines and in Worksites. To support the mainline routine testing and commissioning activities for the new EMU railcars, the Project requires the Services of a rail safeworking accredited PO3 with Pilot experience to implement the TOA required to provide the necessary protection to the Project work groups and guiding of railcar drivers through the testing sites. The PTA may from time-to-time also request the Contractor provide rail safeworking personnel for other roles such as a PO1, PO2 or PRES and this may be for the EMU activities, DMU activities, Bellevue Depot activities, or Nowergup Depot activities. The PTA may also require the services of more than one PO3 during the same shift in the event that multiple worksites are used for testing activities.