The refurbishment of existing toilet block, which includes building works, and installation of new sewage system and solar panels to run the new sewage system.The footprint measures approximately 9m by 8.5m. The existing septic system consists of 2‑4000L Fibreglass septic tanks to 2-30m long absorption trenches.The new facility will consist of:· Private change room areas.· 9 unisex toilets.· 1 unisex ambulant toilet.· 1 unisex accessible toilet with baby change facility.· New Taylex secondary wastewater treatment system and absorption area.· New 30W solar panels to existing roof structure.· New solar battery storage structure.The new roof top solar system will service the new wastewater treatment system.
← Back to public awards
NT · PUBLIC AWARD
Darwin Region - Litchfield National Park - Wangi Falls Toilet Refurbishment
Darwin, Palmerston, Litchfield
Department of Infrastructure, Planning and Logistics
AWARD DETAILS
- Buyer
- Department of Infrastructure, Planning and Logistics
- State
- NT
- Published
- Contract start
- —
- Category
- Building
- Value
- $916.3k
- Value type
- AUD
- Procurement method
- Public
- Record updated