A brief scope for Guildford Rail Bridge Maintenance Walkways is provided below for the purposes of this document. A more detailed scope of works for the project is in the Clause 3, Scope of Works Specifications. Installation of two maintenance walkways; one on each of the two Guildford bridges (Up Main and Down Main);Removal of the existing static line systems;Removal of existing refuges;Installation of two new static line fall arrest systems on the walkways;Modifications to the cable tray storage system for services to ensure compatible installation;Painting and/or corrosion protection of connection points to minimise rates of rust or deterioration;Earthing and bonding;Anti-climb measures andRemoval of existing refuge platforms.
Public award record
Fabrication, Supply and Install for Guildford Road Rail Bridge Walkways
- Location
- Perth Metropolitan
- Public buyer
- Public Transport Authority
AWARD DETAILS
- Buyer
- Public Transport Authority
- State
- WA
- Published
- Contract start
- —
- Category
- Railway bridge - (100%)
- Value
- $4.6M
- Value type
- (Estimate)
- Procurement method
- Open Advertisement
- Record updated