Darwin - Nightcliff Middle School - Master Plan Upgrades Design & Documentation Consultancy

Australia Department of Infrastructure, Planning and Logistics
AWARD DETAILS
Buyer
Department of Infrastructure, Planning and Logistics
State
NT
Published
Contract start
Category
Consultancy
Value
$232.6k
Value type
AUD
Procurement method
Public
Record updated
PUBLIC RECORD

On behalf of our Client, Department of Education (DoE), the Department of Infrastructure, Planning and Logistics (DIPL) propose internal and external upgrades to Nightcliff Middle School.The scope defined in this project builds on projects and themes identified in the 2018 Master Plan prepared by Conrad Gargett (Attached for information only).Further detail, layouts and functional requirements are provided in Appendix A. The Design Team will be required to develop this in detail following site investigations and through consultation with DoE through DIPL. The Client and their stakeholders will continue to be the consultative focus for the project and will have the opportunity to make comment and provide input into the project as it develops. The services required under the Contract comprise of two (2) components:Component 1:Develop a new site-wide landscape master plan as part of the design works for this project (documented separately - not for construction) – Refer to the 2018 Master Plan: 7.0 Landscaping. Include full and comprehensive investigations, consultations and concepts as outlined in this RFT. Deliverables to be comprehensive and appropriate to guide the landscape design in Component 2.Component 2:Full design and documentation of the scope as outlined in this RFT. Deliverables must be suitable for use in a Construct only Contract.A summary of the works is as per below:1. Urban Landscaping: Area 12. Urban Landscaping: Area 23. Urban Landscaping: Area 34. Main Block upgrades5. Home Economics Block upgrades6. Demolish Girl’s Academy Building7. Demolish Canteen Building8. School Car Park line markingAsbestos confirmed. Refer to Asbestos RegisterConstruction shall be staged to enable continuous operation of the school – documentation to reflect this information.Other than by natural progression of the design process, the scope, design intent as described in this Contract are not to be changed without written permission from the Principal’s Representative