Design and Construction of Disinfection Upgrade at Barmah Water Treatment Plant
Location: Victoria
Buyer: Goulburn Valley Water
Opened: May 12, 2026
Closing: Jun 30, 2026
Public Utilities and Public Sector Related Services
### 🏗️ Project Overview
Goulburn Valley Water (GVW) is inviting tenders for the **Design and Construction of a Disinfection Upgrade** at the Barmah Water Treatment Plant. This project involves the implementation of new UV and GAC (Granular Activated Carbon) disinfection systems to enhance water treatment capabilities.
### 📋 Key Requirements
* **Safety Certification:** Contractors bidding for work valued at $100,000 or more must possess a third-party certified safety system (e.g., AS/NZS 4801:2001).
* **Compulsory Site Inspection:** A mandatory site visit is scheduled for **Tuesday, 19 May 2026, at 11:00 AM** at the Barmah Water Treatment Plant, Murray Street, Barmah, Victoria. Attendance must be registered via email by 3:00 PM on 18 May 2026.
* **PPE Policy:** All site visitors must adhere to strict safety attire, including long-sleeved shirts, long trousers, hats, high-visibility vests, and appropriate foot protection.
### 🎯 Scope of Work
The successful contractor will be responsible for the full design and construction lifecycle of the UV and GAC disinfection infrastructure.
### 🔍 Search Keywords
Water Treatment, Disinfection Upgrade, UV Disinfection, GAC Filtration, Goulburn Valley Water, Infrastructure Construction, Victorian Government Procurement, Water Utility Engineering.