B7533 Yanco Creek Bridge Rehabilitation β Deck Post-Tensioning
Location: Murray/Riverina, South Coast, Southern Tablelands
Buyer: Transport Infrastructure Projects
Opened: Feb 26, 2026
Closing: Mar 26, 2026
Building and property - Bridges and tunnelsRequest for tender (RFT)
### ποΈ Project Overview
Transport Infrastructure Projects is seeking tenders for the **B7533 Yanco Creek Bridge Rehabilitation**, specifically focusing on **Deck Post-Tensioning**. This critical infrastructure project is located 28km North of Jerilderie on the Kidman Way (MR321) in New South Wales. The primary objective is to enhance the structural integrity of the bridge deck through specialized engineering works.
### π οΈ Key Requirements and Scope
The scope of work includes specialized bridge maintenance activities such as **scaffolding, coring, grouting, and stressing** to facilitate external post-tensioning of the bridge deck in the transverse direction. All works must strictly adhere to provided project designs, environmental requirements, and technical reports.
### π Location and Mandatory Briefing
The project spans the Murray/Riverina, South Coast, and Southern Tablelands regions. A **mandatory pre-tender meeting and site visit** is scheduled for **March 12, 2026, at 11:00 AM** at the Yanco Creek Bridge site. Attendance is a prerequisite for submitting a conforming tender. Interested parties must confirm attendance by March 9, 2026.
### π Qualifications and Compliance
Bidders must demonstrate expertise in bridge rehabilitation and post-tensioning. Compliance with the **NSW Government Procurement Policy Framework**, Supplier Code of Conduct, and Industrial Relations Guidelines for Building and Construction is mandatory. Evaluation will be based on capability, methodology, financial capacity, and risk management.
### π― Desired Outcomes
The successful contractor will deliver a rehabilitated bridge deck that meets all safety and engineering standards, ensuring the long-term durability of the Yanco Creek crossing. Key deliverables include the successful installation and stressing of the transverse post-tensioning system.