MR261 Barrengarry Mtn NDR’22 - Site 2 + 12 Slope Stabilisation

Location: South Coast, Southern Tablelands

Buyer: Transport Infrastructure Projects

Opened: Jun 01, 2026

Closing: Jun 29, 2026

Building and property - Roads and railRequest for tender (RFT)
🏗️ Project Overview Transport for NSW is seeking experienced contractors for slope stabilisation works at two sites (Site 2 and 12) on Moss Vale Road, Barrengarry Mountain. This project is part of the 2022 Natural Disaster Recovery (NDR) program. 🛠️ Scope of Works The successful tenderer will be responsible for the supply and construction of temporary and permanent remediation works, including: Slope Stabilisation: Installation of horizontal drains, soil nailing, and tension mesh. Surface Treatment: Shotcrete application with architectural 'mock rock' colouring. Infrastructure: Erosion control matting, general concrete kerb installation, and traffic management. 📋 Key Requirements Mandatory Pre-Tender Meeting: An online meeting is scheduled for Monday, 8 June 2026, at 10:00 AM. Attendance is mandatory to submit a conforming tender. Confirm attendance by COB 5 June 2026 via email. Compliance: Tenderers must adhere to the NSW Government Procurement Policy Framework, the Supplier Code of Conduct, and the Transport Statement of Business Ethics. Reporting: Successful bidders will be required to submit quarterly reports. 📍 Location & Timeline Location: Barrengarry Mountain, NSW (South Coast/Southern Tablelands). Closing Date: 29 June 2026, 3:00 PM. Decision Date: 28 August 2026. 🔍 Search Keywords Slope stabilisation, road infrastructure, geotechnical engineering, soil nailing, shotcrete, NDR 2022, Transport for NSW, construction tender, civil engineering, Barrengarry Mountain.