Installation of 10 Standalone Power Systems (SPS) - Remote Communities
Location: Kimberley, Pilbara
Buyer: Horizon Power
Opened: Jan 01, 2025
Closing: Mar 26, 2026
Power plants - 30%Electric utilities - 70%
### ⚡ Project Overview
Horizon Power is inviting tenders for the **Installation of 10 Standalone Power Systems (SPS)** across remote communities in Western Australia. This project involves the comprehensive installation, testing, commissioning, and handover of power station upgrades at up to ten distinct sites within the **Kimberley** and **Pilbara** regions.
### 🛠️ Scope of Work
The works focus on implementing **modular hybrid systems** designed to provide reliable energy to remote areas. The technical scope includes:
* **Solar PV** integration
* **Battery Energy Storage Systems (BESS)**
* **Diesel Generation** units
* Full site commissioning and operational handover
### 📍 Location and Impact
The project targets remote community sites in Western Australia, specifically focusing on the Kimberley and Pilbara regions. These upgrades are critical for enhancing the energy infrastructure and reliability for local residents through modern Standalone Power Systems (SPS).
### 📅 Key Information
* **Closing Date:** March 26, 2026, at 2:00 PM Perth time.
* **Briefing Session:** An online briefing is scheduled for March 6, 2026. Registration is required via email.
* **Primary Contact:** Bianca Eriyagama (bianca.eriyagama@horizonpower.com.au).
### 🔍 Search Keywords
Horizon Power, Standalone Power Systems, SPS, Solar PV, Battery Storage, Diesel Generation, Remote Power, Kimberley, Pilbara, Power Station Upgrades, Western Australia Energy.