Schlinks Pass Culverts 27 & 28 Stabilisation Project
Location: New South Wales
Buyer: Department of Climate Change, Energy, the Environment and Water
Opened: Mar 23, 2026
Closing: Apr 17, 2026
ConstructionRequest for tender (RFT)
### đď¸ Project Overview
The Department of Climate Change, Energy, the Environment and Water is seeking qualified contractors for the **Schlinks Pass Culverts 27 & 28 Stabilisation Project (SR01087)**. This critical infrastructure project aims to repair slope failures at two culvert sites on the Schlink Pass Road within Kosciuszko National Park (KNP).
### đŻ Scope of Work
The successful contractor will be responsible for:
* **Site Preparation:** Developing WHS, environmental plans, and work methodologies.
* **Civil Works:** Excavating road cutting faces and road benches to a depth of 3 metres.
* **Structural Improvements:** Constructing terramesh reinforced gabion retaining walls and installing new drainage structures, including half-round corrugated steel pipes and reno mattresses.
* **Rehabilitation:** Site cleanup, soil disposal, and final rehabilitation.
### đ Key Requirements
* **Mandatory Scheme:** Bidders must be members of the **Construction Scheme (SCM0256)** for works up to $1 million.
* **Pre-Tender Meeting:** A mandatory meeting is scheduled for **April 2, 2026, at 10:30 AM** via Microsoft Teams. Attendance confirmation is required at least 3 business days prior.
### đ Importance
Schlink Pass Road is a vital corridor for NPWS and Snowy Hydro Limited, serving as the only access route between Guthega and Geehi. Current slope failures have restricted road capacity to 5 tonnes, posing significant operational and emergency egress risks.
**Keywords:** Civil Construction, Road Stabilisation, Culvert Repair, Gabion Walls, KNP Infrastructure, NSW Government Tender, SCM0256.