Installation of two (2) diesel refuelling stations and above ground bulk storage tanks. One 20,000lt with High Flow bower to be installed at the Town of Port Hedland’s Landfill and one 30,000lt with both high flow and standard flow bowers installed at the Town of Port Hedland’s Depot. Both refuelling stations need to have a full fuel management system (FMS).…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Town of Port Hedland
Buyer address
13 McGregor St, Port Hedland, Western Australia 6721, Australia
Status
Closed
Opened
04 Dec 2018
Closed
06 Feb 2019
Decision
06 Apr 2019
Categories
Construction & Operation, Fuel & Oils

Summary and scope

Installation of two (2) diesel refuelling stations and above ground bulk storage tanks. One 20,000lt with High Flow bower to be installed at the Town of Port Hedland’s Landfill and one 30,000lt with both high flow and standard flow bowers installed at the Town of Port Hedland’s Depot. Both refuelling stations need to have a full fuel management system (FMS). All works must be completed as per the Dangerous Goods Act 2004, Dangerous Goods Safety (Storage and Handling of Non-Explosives) Regulations 2007. The contractor is to provide the price based on two (2) options; • Option 1 - provide lump sum price for the all equipment and tanks and also a breakdown of the equipment required, • Option 2, leasing price for five (5) years (3years with 2x12month extension options) all installed equipment. Once equipment is set up and ready for use a bulk fuel supplier will be sought through the WALGA or CUA Panel. A full statement of the Goods/Services required under the proposed Contract appears in Part 3: Specification.