AUSTRALIA · TENDER

Expressions of Interest - Supply of Reinforced Concrete Pipes and Box Culverts

The Carmichael Rail Network (CRN) will incorporate up to 3,810 culvert structures with a combination of Corrugated Metal Pipes (CMP), Reinforced Concrete Pipes (RCP) and Reinforced Concrete Box Culverts (RCBC) will be installed for waterways, drainage areas, occupational crossings and fauna crossings. Approximately 369 no. RCBC culverts and 20 no. RCP culver…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

This is an early-stage notice or expression of interest. A later procurement stage is not confirmed here; check the issuing buyer for any subsequent notice.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Adani Carmichael Mine and Rail Project
Buyer address
suite 2/2 Mcilwraith St, South Townsville, Queensland 4810, Australia
Status
Closed
Opened
12 Jun 2019
Closed
27 Jun 2019
Decision
10 Jul 2019
Categories
Construction & Operation, Water & Sewage

Summary and scope

The Carmichael Rail Network (CRN) will incorporate up to 3,810 culvert structures with a combination of Corrugated Metal Pipes (CMP), Reinforced Concrete Pipes (RCP) and Reinforced Concrete Box Culverts (RCBC) will be installed for waterways, drainage areas, occupational crossings and fauna crossings. Approximately 369 no. RCBC culverts and 20 no. RCP culverts will be installed in around 75 different locations along the rail corridor. Culverts will need to comply with TMR and AS Standards for the relevant load classes. Manufacturers shall supply culverts for 369 no. RCBC structures with an average length of 19 metres, and 20 no. RCP structures, with an average length of 23 metres, within a 5 – 6 month period commencing September 2019. Tables 1 and 2 include approximate numbers of Reinforced Concrete Pipes (RCP) by diameter and Reinforced Concrete Box Culverts (RCBC) by dimension respectively. Please find tables attached. Please also find attached Typical Details drawings for RCBC and RCP culverts. Please note this is a expression of interest. Full scope of work will provided to shortlisted respondents who respond to this EOI. If your organisation receives a media request for television, radio, social media or other relating to the Adani Carmichael Mine or Rail Project, you must submit the request to ausmedia@adani.com.au. Any media request must not be provided unless without the express written permission of Adani Australia Media and Communications Manager or the Chief Executive Officer has been obtained in advance

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.