AUSTRALIA · TENDER
Crowe Pavilion Redevelopment at Thomas Carroll Reserve
This Contract is for the demolition and construction of a new sporting pavilion at Thomas Carroll Reserve in Dandenong. SCOPE of Works: In general, the works included within this Tender consist of the following: • Demolition of the existing brick pavilion [complete removal including floor slabs]. Note – external ‘face’ bricks to be re-cycled for new paving s…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- City of Greater Dandenong
- Buyer address
- 225 Lonsdale Street, Dandenong, Victoria 3175, Australia
- Status
- Closed
- Opened
- 06 Aug 2019
- Closed
- 29 Aug 2019
- Decision
- 09 Dec 2019
- Categories
- Construction & Operation
Summary and scope
This Contract is for the demolition and construction of a new sporting pavilion at Thomas Carroll Reserve in Dandenong. SCOPE of Works: In general, the works included within this Tender consist of the following: • Demolition of the existing brick pavilion [complete removal including floor slabs]. Note – external ‘face’ bricks to be re-cycled for new paving surrounding the new pavilion. Existing cricket nets be re-located, time keepers two storey structure to be demolished. • Oversite excavation. • Sub-floor construction [to be prepared to accept prefabricated modules]. • [Possibly separate to the item listed above, roof frames]. • External decking to perimeter of pavilion. To both East and West elevations, patio’s to North & South covered areas. • Tiered seating and ramps adjacent to change rooms on East & West elevations. • Civil works – storm water & sullage drainage, utilities supplies to new structure. • Brick paving to perimeter of new pavilion. Concrete paving to each Oval entry gate from player ramps. • Service connections.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.