AUSTRALIA · TENDER
MR RFQ - fabrication of rail and sleeper cradles
Martinus rail requires fabrication of rail and sleeper cradles as per design. All relevant information including invitation to tender can be found in attachments. Suppliers must be based in QLD. FAQs: 1) Pricing 29,20,10 options Response: This option is based on some supplier may be unable to complete the volume of work in the timeframe. Therefore we are loo…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Martinus Rail
- Buyer address
- 108 Grindle Rd, Rocklea, Queensland 4106, Australia
- Status
- Closed
- Opened
- 26 May 2020
- Closed
- 12 Jun 2020
- Decision
- 14 Jul 2020
- Categories
- Construction & Operation, Indust. Production, Manufacturing
Summary and scope
Martinus rail requires fabrication of rail and sleeper cradles as per design. All relevant information including invitation to tender can be found in attachments. Suppliers must be based in QLD. FAQs: 1) Pricing 29,20,10 options Response: This option is based on some supplier may be unable to complete the volume of work in the timeframe. Therefore we are looking for 3 options of pricing 2) What expectation do the have in regards to weld testing if any? Response: As per AS1554 3) On the SLEEPER SUPPORT ASSEMBLY to they want a HDPE wear strip or a hardwood one. One section of the drawing and the parts list states timber while another states HDPE Response: Timber 4) Just Wondering if we need to supply any pins for the Link Rail Assembly? There are 2 x 20mm holes in the rail arm? Also do we need to supply a cotter’s pin or something similar for the Link rail fixed pin? Response: The link Rail assembly pins must be supplied by the manufacturer 5) What sort of NDT is required for this assembly? Response: MPI AS1554 6) No surface treatment required at all. Response: Price to paint white as an option.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.