AUSTRALIA · TENDER

F3980-F04-Reclaim Tunnel

The Carmichael Coal Handling Plant (CHP) Project includes the construction of a new reclaim conveyor tunnel and an interconnecting emergency escape tunnel. The reclaim conveyor tunnel encapsulates the reclaim conveyor and is located below two (2) adjacent coal stockpiles, which is reclaimed using four (4) reclaim valves. The reclaim conveyor tunnel is constr…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
G&S Engineering Services Pty Ltd
Buyer address
27 Len Shield St, Paget, Queensland 4740, Australia
Status
Closed
Opened
14 Jul 2020
Closed
30 Jul 2020
Decision
05 Aug 2020
Categories
Construction & Operation, Indust. Production, Manufacturing

Summary and scope

The Carmichael Coal Handling Plant (CHP) Project includes the construction of a new reclaim conveyor tunnel and an interconnecting emergency escape tunnel. The reclaim conveyor tunnel encapsulates the reclaim conveyor and is located below two (2) adjacent coal stockpiles, which is reclaimed using four (4) reclaim valves. The reclaim conveyor tunnel is constructed using a concrete footing with a corrugated steel arch structure. The attached documents detail the requirements for a steel arch tunnel (reclaim conveyor tunnel) and a smaller diameter tunnel (emergency escape tunnel). The two (2) tunnels shall be referred to as the Reclaim Tunnel within this document. The scope includes the design, supply, fabricate, surface treatment, testing, quality control, documentation, packaging and delivery for the Carmichael Coal Mine CHP Project Reclaim Tunnel Supply ready for operation in accordance with the documents referenced within this document. The equipment shall suit the duty, service and operating conditions set out herein with special emphasis on safety, design life and reliability.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.