AUSTRALIA · TENDER

RFT 20-0510 - Supply and Installation of Solar PV at Nine Sites

Carpentaria Shire Council (the Principal) recognises the opportunity to reduce operational costs and environmental impact via the installation of behind-the-meter solar photovoltaic (PV) power systems at its facilities. An assessment of Council’s major facilities has identified the preferred size of solar system to be installed at each site based on its elec…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Carpentaria Shire Council
Buyer address
Haig St, Normanton, Queensland 4890, Australia
Status
Closed
Opened
24 Aug 2020
Closed
01 Oct 2020
Decision
11 Nov 2020
Categories
Building Trade, Repairs, Maint., ELEC, Lighting, Equip & Services

Summary and scope

Carpentaria Shire Council (the Principal) recognises the opportunity to reduce operational costs and environmental impact via the installation of behind-the-meter solar photovoltaic (PV) power systems at its facilities. An assessment of Council’s major facilities has identified the preferred size of solar system to be installed at each site based on its electrical load and roof availability. The Principal requires the Contractor to design, supply, construct, install and commission solar power systems totalling a proposed 340kWp capacity to be installed across the nine sites as set out below. Normanton Water Treatment Karumba Sewage Treatment Plant Glenore Weir Intake Pump Karumba Reservoir Pump LWBDC Interpreter Centre Karumba Pool Normanton Office Normanton Swimming Pool Normanton Depot Council will enter a contract to install solar systems that are optimised for each site and which may differ the proposed system sizes. The Contractor’s scope of works includes, but is not limited to: (a) Site investigations to verify suitability of all proposed systems, including structural and safe access investigations (b) Design and Documentation (c) Construction Management (d) Structural certification (e) Approvals Consents and Licences (f) Supply and Installation of turnkey solar power system and monitoring (g) Testing and Commissioning (h) Performance testing (i) Provision of system warranties, maintenance and servicing throughout the Defects Liability Period Each work element is described in detail in the Technical Specification document. The project delivery must be completed as soon as practical and achieve Practical Completion no later than 30 June 2021. Unless the Superintendent directs otherwise, the project delivery shall be consistent with the Works Program submitted with the Contractor’s tender.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.