AUSTRALIA · TENDER

RFQ2021/009 Renew and Upgrade Big Swamp Shared Path Stage Two

The City of Bunbury is seeking a suitably qualified and experienced contractor to undertake the Works as defined by the Scope of Works and Design Drawings Appendix D. This contract is to construct a red asphalt path 3 metres wide with a 200mm wide concrete flush kerb on each side. Where the path is built off the back of the road kerb, the kerb will be instea…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
City of Bunbury
Buyer address
4 Stephen St, Bunbury, Western Australia 6230, Australia
Status
Closed
Opened
26 Aug 2020
Closed
11 Sept 2020
Decision
22 Oct 2020
Categories
Construction & Operation

Summary and scope

The City of Bunbury is seeking a suitably qualified and experienced contractor to undertake the Works as defined by the Scope of Works and Design Drawings Appendix D. This contract is to construct a red asphalt path 3 metres wide with a 200mm wide concrete flush kerb on each side. Where the path is built off the back of the road kerb, the kerb will be instead of the flush kerb. A 4 metre wide road base limestone/crushed concrete pavement at 250mm thick is required. The existing asphalt and kerbed path on Tuart street will be removed back to a full 3 metre width and the new path will begin at that point. Trees need to be removed along the new alignment as per Appendix D. All the stumps are to be ground below level. This is a high-profile area. Works are to be completed without delays and the works area is to be kept clean and tidy.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.