AUSTRALIA · TENDER
Q21061 – Toorak/South Yarra Library Boiler Replacement
Quotations are invited for the Works which include the demolition of the existing system, supply, installation and integration into the existing building management system (BMS) all as per the drawings and specifications provided. Supply and install the complete Mechanical Services installation and associated services for the new installation, including but…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Stonnington City Council
- Buyer address
- 311 Glenferrie Rd, Malvern, Victoria 3144, Australia
- Status
- Closed
- Opened
- 23 Apr 2021
- Closed
- 17 May 2021
- Decision
- 06 Jun 2021
- Categories
- Mechanical Plant, Equip, Services
Summary and scope
Quotations are invited for the Works which include the demolition of the existing system, supply, installation and integration into the existing building management system (BMS) all as per the drawings and specifications provided. Supply and install the complete Mechanical Services installation and associated services for the new installation, including but not limited to the following; all builder’s work, removal of all redundant equipment, ductwork, pipework, controls, etc., hydronic heating systems, including boilers, flues, pumps, valves and pipework, gas reticulation, automatic controls, electrical work, commissioning, testing and putting into service, as-built drawings and maintenance manuals, routine maintenance during defects liability period, Certificate of Compliance. NOTE: The Vendorpanel online forum closes five business days prior to the abovementioned tender closing date. Council reserves the right not to accept the lowest or any Quotation, or part thereof received after the closing time will not be considered.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.