IRCT-CLM5-0321-227 CLERMONT CIVIC CENTRE AIR-CONDITIONING PROJECT
Design and construct of a new compliant connection from upgraded main supply to Civic Centre in accordance with all applicable regulations. In addition: The Contractor to provide new circuit breaker main switch and replace existing moulded case Breakers with electronic and new supply to the Mechanical Services Switchboard (MSSB). For moulded case circuit bre…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Isaac Regional Council
- Buyer address
- Griffin Street, Moranbah, Queensland 4744, Australia
- Status
- Closed
- Opened
- 14 Jun 2021
- Closed
- 29 Jul 2021
- Decision
- 25 Aug 2021
- Categories
- Building Trade, Repairs, Maint., ELEC, Lighting, Equip & Services, Electronic Components & Supplies, Mechanical Plant, Equip, Services
Summary and scope
Design and construct of a new compliant connection from upgraded main supply to Civic Centre in accordance with all applicable regulations. In addition: The Contractor to provide new circuit breaker main switch and replace existing moulded case Breakers with electronic and new supply to the Mechanical Services Switchboard (MSSB). For moulded case circuit breakers to be replaced. Overload settings are based on existing trip settings. Contractor to review cables size in relation to overload settings and adjust accordingly. The Contractor to provide shunt trip to MSSB circuit breaker to shed MSSB load on generator start up. The existing generator are unable to support new air conditioning loads. The Contractor to confirm circuit breakers compatibility with the existing chassis prior to the ordering of circuit breakers. The works to be performed under this contract include but are not necessarily limited to: The manufacture, supply, delivery and installation on site of air conditioning and ventilation systems, Electrical wiring and associated building works and include testing, commissioning and maintenance of all, Equipment as more fully specified herein, together with the provision of workshop drawings and operation manuals, Maintenance manuals with “as installed” drawings.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.