PDWWTP SBR Basin Aeration System Upgrade - Design and if ordered, Supply and Install

Douglas Shire Council (DSC) requires the services of a suitable contractor to provide certified detailed design drawings for a replacement removable aeration system for the Sequencing Batch Reactor basins (2 of). The drawings will support an application for funding from the QLD State Government. If funding is approved, DSC with engage the successful contract…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Douglas Shire Council
Buyer address
Front St, Mossman, Queensland 4873, Australia
Status
Closed
Opened
31 Oct 2021
Closed
07 Dec 2021
Decision
17 Jan 2022
Categories
Water & Sewage

Summary and scope

Douglas Shire Council (DSC) requires the services of a suitable contractor to provide certified detailed design drawings for a replacement removable aeration system for the Sequencing Batch Reactor basins (2 of). The drawings will support an application for funding from the QLD State Government. If funding is approved, DSC with engage the successful contract to supply, install and commission the new system. Award for detailed design will be after Council meeting on 25 January. Detailed design drawings are required by DSC no later than 31 March 2022 to meet the application deadline. Funding approval for design and installation will not be known until June 2022. Initial contract price will be for design portion only. Tenderers are requested to provide a price at current rates for supply and installation. DSC accepts that there may be escalation due to the timeframes, but requires transparency if escalation is to be applied, ie, escalation should be based on the appropriate index and other justification.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.