AUSTRALIA · TENDER
PDWWTP SBR Basin Aeration System Upgrade - Design and if ordered, Supply and Install
Douglas Shire Council (DSC) requires the services of a suitable contractor to provide certified detailed design drawings for a replacement removable aeration system for the Sequencing Batch Reactor basins (2 of). The drawings will support an application for funding from the QLD State Government. If funding is approved, DSC with engage the successful contract…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Douglas Shire Council
- Buyer address
- Front St, Mossman, Queensland 4873, Australia
- Status
- Closed
- Opened
- 31 Oct 2021
- Closed
- 07 Dec 2021
- Decision
- 17 Jan 2022
- Categories
- Water & Sewage
Summary and scope
Douglas Shire Council (DSC) requires the services of a suitable contractor to provide certified detailed design drawings for a replacement removable aeration system for the Sequencing Batch Reactor basins (2 of). The drawings will support an application for funding from the QLD State Government. If funding is approved, DSC with engage the successful contract to supply, install and commission the new system. Award for detailed design will be after Council meeting on 25 January. Detailed design drawings are required by DSC no later than 31 March 2022 to meet the application deadline. Funding approval for design and installation will not be known until June 2022. Initial contract price will be for design portion only. Tenderers are requested to provide a price at current rates for supply and installation. DSC accepts that there may be escalation due to the timeframes, but requires transparency if escalation is to be applied, ie, escalation should be based on the appropriate index and other justification.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.