AUSTRALIA · TENDER
Multipurpose Clubhouse Roy Day Park Sapphire Revised Scope
Demolish Existing Building Disconnect all services Water/Power/Gas bottles to the existing building Demolish and remove from the site all concrete & associated materials. Approximate building size 28 X 8 = 224 m2 All Earthworks are required to accommodate building levels to suit existing building levels. See attached soil report Design & Construct a multiuse…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Central Highlands Regional Council
- Buyer address
- 65 Egerton St, Emerald, Queensland 4720, Australia
- Status
- Closed
- Opened
- 09 Nov 2021
- Closed
- 03 Dec 2021
- Decision
- 09 Dec 2021
- Categories
- Building Products & Materials, Building Trade, Repairs, Maint., Construction & Operation
Summary and scope
Demolish Existing Building Disconnect all services Water/Power/Gas bottles to the existing building Demolish and remove from the site all concrete & associated materials. Approximate building size 28 X 8 = 224 m2 All Earthworks are required to accommodate building levels to suit existing building levels. See attached soil report Design & Construct a multiuser Building at Roy Day Park, Anakie Sapphire Rd, The Gemfields Approximate internal area 302m2 + Veranda 283m2 Refer to Architects Drawings for layout & detail. Plumbing under-slab from sinks and hand basins as marked to the edge of building in preparation for future connection Refer to attached design
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.