LG314/1076/22/013 - Design and Construct Bank Stabilisation at Lions Head, Miami
The Principal requires a suitably experienced, resourced, and licenced Contractor to undertake the work under the Contract in accordance with this Principal’s Project Requirements and supporting documentation. The Contractor is responsible for the full DD, CD, and construction of the Lions Head Park bank stabilisation Works, including any further geotechnica…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- City Of Gold Coast
- Buyer address
- 9 Holden Pl, Bundall, Queensland 4217, Australia
- Status
- Closed
- Opened
- 28 Sept 2022
- Closed
- 10 Nov 2022
- Decision
- 07 Feb 2023
- Categories
- Building Trade, Repairs, Maint., Construction & Operation, Engineer, Research, Tech services
Summary and scope
The Principal requires a suitably experienced, resourced, and licenced Contractor to undertake the work under the Contract in accordance with this Principal’s Project Requirements and supporting documentation. The Contractor is responsible for the full DD, CD, and construction of the Lions Head Park bank stabilisation Works, including any further geotechnical and environmental investigations where required. The Contractor must visit the Site to determine the extent of works and undertake Site measure. The Contractor is responsible for the procurement, coordination and installation of all construction activities described within this document. Undertake the following work under the Contract, including but not limited to, the following: • Design and construct rock stabilisation works • Site establishment • Vegetation clearing • Scale and clear batter faces • Supply and install Tecco Mesh or Superintendent approved equivalent • Supply and install anchors • Supply and install shotcrete slope protection • Supply and install spoon drain along slope crest and connect to existing stormwater. The Principal provides the following tender documents: 01 Invitation to Offer 02 Major Conditions of Offer 03 Principal's Project Requirements AS4300 04 Conditions of Contract AS4300-1995 Amended 05 Response Forms Non-Price Submission 05a Response Forms Non-Price Submission - Attachment A - Deviations Table 06 Response Form Price Submission 07 Response Form Contract Header AS4300 Attachments: • Attachment A – Lions Head Detailed Design Report - 2015 • Attachment B - Crane Lifting Plan • Attachment C - Noise Report • Attachment D - Vibration Report • Attachment E - Environmental Management Plan • Attachment F - Dilapidation Report (April 2021) • Attachment G - Landslide Risk Assessment • Attachment H – Flying Fox Action Plan • Attachment I – Flying Fox Peak Season • Attachment J – Design Drafting Outsourcing Guidelines • Attachment K – Fencing Works Site Photos • Attachment L - Council Turf Specification • Attachment M – Survey • Attachment N – Dilapidation Report (September 2020)