AUSTRALIA · TENDER
Demountable Building - Dunwich Wastewater Treatment Plant - North Stradbroke Island
Redland City Council (RCC) requires a main/head Contractor for the supply, design, construction and handover of a 9m x 3m office and staff lunchroom building (demountable/prefabricated style) to be located at the Dunwich Wastewater Treatment Plan (WWTP) located at Dunwich, North Stradbroke Island. Major deliverables are: • Supply all material for the demount…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Redland City Council
- Buyer address
- Bloomfield St, Cleveland, Queensland 4163, Australia
- Status
- Closed
- Opened
- 25 Jun 2023
- Closed
- 18 Jul 2023
- Decision
- 14 Aug 2023
- Categories
- Building Products & Materials, Construction & Operation
Summary and scope
Redland City Council (RCC) requires a main/head Contractor for the supply, design, construction and handover of a 9m x 3m office and staff lunchroom building (demountable/prefabricated style) to be located at the Dunwich Wastewater Treatment Plan (WWTP) located at Dunwich, North Stradbroke Island. Major deliverables are: • Supply all material for the demountable/prefabricated style office building, including transport to the site at Ballow St, North Stradbroke Island. • Design and Construction of the building with suitable foundations. • Internal partitioning planned to Council staff requirements to create space for office desk, kitchenette, toilet, shower, and laundry space created for moving existing clothes washing and drying machines. A guideline sketch has been provided under Figure 2. • Enable the building with power, hot and cold-water plumbing, wastewater drainage, internet/communications and also install an air conditioner (all services can be accessed from the current site facilities). • Seeking all building approvals and inspections as per the applicable codes/standards and Council approvals. • Provide RCC with all handover documents including compliance and occupancy certificates, enabling building occupation. Please refer to Section A Part 4 - Project Brief for full specification and scope of works.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.