AUSTRALIA · TENDER

LG314/ 621/24/026 - Investigation Broadwater Parklands Rockpools

ackground Broadwater Parklands Rockpools (wet play) completed construction in September 2010. The water that creates the Rockpools as a ‘wet play’ area is taken from the Broadwater which means it is salt water and then it is treated to pool standards. Due to this and several other factors including underground ventilation and/or flooding issues, the pump roo…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
City Of Gold Coast
Buyer address
9 Holden Pl, Bundall, Queensland 4217, Australia
Status
Closed
Opened
20 Sept 2023
Closed
02 Nov 2023
Decision
29 Nov 2023
Categories
Engineer, Research, Tech services

Summary and scope

ackground Broadwater Parklands Rockpools (wet play) completed construction in September 2010. The water that creates the Rockpools as a ‘wet play’ area is taken from the Broadwater which means it is salt water and then it is treated to pool standards. Due to this and several other factors including underground ventilation and/or flooding issues, the pump room and other mechanical elements of the Rockpools are failing which then has a flow on effect to the aboveground wet play feature operations. Scope of Works The Client wishes to engage a suitably qualified consultant to: Undertake an asset condition audit to ascertain the physical state of the asset which may or may not affect its performance. All assets in the Broadwater Parklands Rockpools (wet play) area are to be include and are not limited to: Underground pump room. Electrical switchboards. Aboveground (wet play surface) current condition including all individual items e.g., play features, bender, tidal pools, etc. The purpose of the data is to ascertain the current condition of the Broadwater Parklands Rockpools and provide a Condition Assessment Report and Option Assessment Report including at a minimum: Current condition audit of all assets. Determine what corrective or routine maintenance action is required and when. Prepare a detailed cost estimate for maintenance requirements. Determine the remaining useful life of the asset and prediction of failure. Ascertain the reason for performance deficiencies. Prepare a cost benefit analysis and provide a recommendation on maintaining the current system or complete replacement, complete knockdown and relocation of pumproom etc. Provide a detailed estimate and BOQ of each potential option. Development of a concept design drawing showing the proposed layout and artistic rendering of the replacement of the Parklands Rockpools, this should include new items e.g., play features, bender, tidal pools, etc.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.