AUSTRALIA · TENDER

23002 Slope Remediation Works - Saplings Pocket Reserve & Flinders Goolman Reserve

Ipswich City Council is seeking a suitably qualified contractor to complete slope remediation works at two (2) locations in the greater Ipswich area. These landslips occurred after a significant rainfall event in February 2022 and the slips/washouts are close to impacted adjoining forestry access tracks, which, if not repaired, would restrict access to large…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
City of Ipswich
Buyer address
1 Nicholas St, Ipswich, Queensland 4305, Australia
Status
Closed
Opened
22 Oct 2023
Closed
27 Nov 2023
Decision
10 Dec 2023
Categories
Construction & Operation

Summary and scope

Ipswich City Council is seeking a suitably qualified contractor to complete slope remediation works at two (2) locations in the greater Ipswich area. These landslips occurred after a significant rainfall event in February 2022 and the slips/washouts are close to impacted adjoining forestry access tracks, which, if not repaired, would restrict access to large forestry areas. Geotechnical Design reports were commissioned in 2022 and 2023 to provide analysis and subsequent recommendations for site remediations. The two (2) remediation slips/sites which form part of this project are located at: • Saplings Pocket Estate, Pine Mountain • Flinders Goolman Estate, Undullah The scope of works for the Saplings Pocket site which has two separate (2) slopes, generally comprises excavation of the existing embankment and placing of a new pipe culvert, followed by backfill of the embankment. The finished surface of the new embankment is to be ~1m lower than current heights to assist in improving stability performance of the embankment. The scope for the Flinders Goolman site generally comprises excavation of the existing embankment into benches for access, placing of the new gabion baskets (empty) and hand filling/filling with light equipment due to restricted access, followed by reconstruction of the embankment in controlled fill layers.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.