AUSTRALIA · TENDER
23002 Slope Remediation Works - Saplings Pocket Reserve & Flinders Goolman Reserve
Ipswich City Council is seeking a suitably qualified contractor to complete slope remediation works at two (2) locations in the greater Ipswich area. These landslips occurred after a significant rainfall event in February 2022 and the slips/washouts are close to impacted adjoining forestry access tracks, which, if not repaired, would restrict access to large…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- City of Ipswich
- Buyer address
- 1 Nicholas St, Ipswich, Queensland 4305, Australia
- Status
- Closed
- Opened
- 22 Oct 2023
- Closed
- 27 Nov 2023
- Decision
- 10 Dec 2023
- Categories
- Construction & Operation
Summary and scope
Ipswich City Council is seeking a suitably qualified contractor to complete slope remediation works at two (2) locations in the greater Ipswich area. These landslips occurred after a significant rainfall event in February 2022 and the slips/washouts are close to impacted adjoining forestry access tracks, which, if not repaired, would restrict access to large forestry areas. Geotechnical Design reports were commissioned in 2022 and 2023 to provide analysis and subsequent recommendations for site remediations. The two (2) remediation slips/sites which form part of this project are located at: • Saplings Pocket Estate, Pine Mountain • Flinders Goolman Estate, Undullah The scope of works for the Saplings Pocket site which has two separate (2) slopes, generally comprises excavation of the existing embankment and placing of a new pipe culvert, followed by backfill of the embankment. The finished surface of the new embankment is to be ~1m lower than current heights to assist in improving stability performance of the embankment. The scope for the Flinders Goolman site generally comprises excavation of the existing embankment into benches for access, placing of the new gabion baskets (empty) and hand filling/filling with light equipment due to restricted access, followed by reconstruction of the embankment in controlled fill layers.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.