AUSTRALIA · TENDER
Ayr Industrial Estate Expansion Sewer Infrastructure Installation
consisting of • approximately 837m of DN150 PVC SN8 Sewers • 20 Manholes ( Including 2 Pump Station Zero manholes ). • 2 Prefabricated Pump Stations (1 Main Pump Station and 1 Re-lift Pump Station) • Approximately 617m of 125mm O.D. H.D.P.E. SDR11 Sewer Rising Main along Craig St. & • Approximately 317m of 90mm O.D. H.D.P.E. SDR11 Sewer Rising Main from Mc C…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Burdekin Shire Council
- Buyer address
- 145 Young St, Ayr, Queensland 4807, Australia
- Status
- Closed
- Opened
- 06 Nov 2023
- Closed
- 08 Dec 2023
- Decision
- 14 Dec 2023
- Categories
- Water & Sewage
Summary and scope
consisting of • approximately 837m of DN150 PVC SN8 Sewers • 20 Manholes ( Including 2 Pump Station Zero manholes ). • 2 Prefabricated Pump Stations (1 Main Pump Station and 1 Re-lift Pump Station) • Approximately 617m of 125mm O.D. H.D.P.E. SDR11 Sewer Rising Main along Craig St. & • Approximately 317m of 90mm O.D. H.D.P.E. SDR11 Sewer Rising Main from Mc Cathie Street Pump Station to the existing 110 O.D. P.E. Rising main behind the existing Industrial Estate.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.