AUSTRALIA · TENDER
1366-2024Q Pedestrian Bridges Maintenance Works
Council is seeking Quotes for proposed maintenance works on Pedestrian Bridges at various location within Council Municipality (5 Pedestrian Bridge in total). Site 1 : Darebin Creek Reserve (1 Abercorn Ave, Ivanhoe) • Timber splitting, minor section loss, loose screws – Maintaining Timber railing. • Replace uneven concrete footpath on the bridge approach on…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- Banyule City Council
- Buyer address
- 1 Flintoff St, Greensborough, Victoria 3088, Australia
- Status
- Closed
- Opened
- 07 Apr 2024
- Closed
- 30 Apr 2024
- Decision
- 27 May 2024
- Categories
- Construction & Operation
Summary and scope
Council is seeking Quotes for proposed maintenance works on Pedestrian Bridges at various location within Council Municipality (5 Pedestrian Bridge in total). Site 1 : Darebin Creek Reserve (1 Abercorn Ave, Ivanhoe) • Timber splitting, minor section loss, loose screws – Maintaining Timber railing. • Replace uneven concrete footpath on the bridge approach on North side. Site 2 : Plenty River Reserve (12A George Court, Greensborough) • Remove the vegetation and replace the ravelling asphalt footpath at South Side of the Bridge approaches. • Repaint the peeling paint of Timber railing on South side of the Bridge Site 3 : Warringal Parklands (2 Beverley Rd, Heidelberg) • Fill the mortar on the Arch culvert and endwalls to ensure there is no gap/cracks on Bridge. • Supply and install rock beaching and seal concrete on top – Match the site condition. Site 4 : Main St – The Circuit to Plenty River (152 Main Street, Greensborough) • Repaint the whole bridge by applying a protective coating on steel barriers and plates. • Remove debris and tree logs that are blocking entrance of the box culvert. Site 5 : Lakeside Drive, Lower Plenty (Corner of Lakeside Dr and Bonds Rd) • Replace aging timber railing on both Side of the bridge. • Replace the deck bridge with the Fibre Glass mini mesh. • Replace uneven concrete footpath on both side of the bridge approach.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.