AUSTRALIA · TENDER
Accessible Toilet Upgrade, Cambridge Hall - Design Services
Scope of the design and associated works to be performed by the Consultant is as follows: a) Gather all site information and infrastructure details necessary to enable the design and modification of an existing internal area to meet the requirements of a new accessible toilet for all. b) prepare a concept plan including but not limited to a floor plan and el…
Find your next opportunity
Check scope, work location and the official closing date before shortlisting.
Confirm the actual work location in the procurement documents.
Key facts
- Buyer
- City of Clarence
- Buyer address
- 38 Bligh St, Rosny Park, Tasmania 7018, Australia
- Status
- Closed
- Opened
- 02 Sept 2024
- Closed
- 17 Sept 2024
- Decision
- 23 Sept 2024
- Categories
- Architecture, Design, Planning, Construction & Operation
Summary and scope
Scope of the design and associated works to be performed by the Consultant is as follows: a) Gather all site information and infrastructure details necessary to enable the design and modification of an existing internal area to meet the requirements of a new accessible toilet for all. b) prepare a concept plan including but not limited to a floor plan and elevations of the new accessible toilet for all. c) complete all required documentation to obtain approvals required. d) prepare engineering design (if required), electrical design, building and hydraulic drawings, documentation, and specifications for approval by Council. The documentation must include a specification for the demolition of the existing room. The documentation must be satisfactory for the Quotation and construction phases of the project which Council will undertake. e) identify and document any project risks and provide a risk management plan and safety in design report in compliance with regulation 295 of the Work Health and Safety Regulations 2012 (Tas). f) obtain the necessary building and plumbing authorisations and/or permits to allow for works to be completed, including but not limited to those required under the Building Act 2016 (Tas). Council will pay all building and plumbing authorisations cost for permits. g) obtain a Certificate of Likely Compliance pursuant to the Building Act 2016 (Tas) h) obtain the necessary approvals and authorisations for any electrical design. I) prepare and provide to Council all other documents, drawings, and specifications necessary for calling of the quotations for construction. j) attend, up to four face to face meetings to be held at Council offices situated at 38 Bligh Street, Rosny Park, Tasmania 7018, or on-site meetings when requested. k) Supply Gantt Chart with end date no later than 20th December 2024 l) The design and related services must be in accordance with relevant legislation including the Disability Discrimination Act 1992 and Australian Standards.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.