NCESS Expression of Interest : Network Support Services for Metropolitan Capacity Expansion

The Coordinator of Energy has determined, under clause 3.11A.4 of the Wholesale Electricity Market (WEM) Rules, to initiate a Non-Co-optimised Essential System Services (NCESS) procurement process for capacity expansion on the Perth network. Western Power is proactively managing capacity constraints as peak demand continues to rise across the South West Inte…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

This is an early-stage notice or expression of interest. A later procurement stage is not confirmed here; check the issuing buyer for any subsequent notice.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Western Power
Buyer address
Wellington St, Perth, Western Australia 6000, Australia
Status
Closed
Opened
05 Sept 2024
Closed
07 Oct 2024
Decision
20 Oct 2024
Categories
Utilities

Summary and scope

The Coordinator of Energy has determined, under clause 3.11A.4 of the Wholesale Electricity Market (WEM) Rules, to initiate a Non-Co-optimised Essential System Services (NCESS) procurement process for capacity expansion on the Perth network. Western Power is proactively managing capacity constraints as peak demand continues to rise across the South West Interconnected System (SWIS). Guided by the WA State Government’s DER Roadmap and recent amendments to the Access Code, Western Power has identified a need for solutions through Network Support Services (NSS). Western Power is inviting Expressions of Interest (EOI) from potential NCESS providers to deliver NSS at up to five metropolitan locations within its distribution network. Five distribution feeders have been selected based on Western Power’s assessment of the underlying need, technical requirements, and the potential for a viable non-network solutions. The required services will involve the capability to decrease load during times of supply shortfall. The proposed services are needed during the 2025-26, 2026-27, and 2027-28 summer periods (from 1 December to 1 April), with service quantities based on forecasted shortfalls for each period. Activation of the service will occur between 4:30 PM and 8:30 PM AWST, with NSS being prioritised over other contracted services. The service may be called upon up to 20 times per summer period, with a minimum duration of one hour. Multiple providers may be considered for a single service. The draft NCESS Service Specification provides detailed requirements for these services. While the preferred commencement date for the proposed services is 1 October 2025, with a three-year duration, Western Power is open to feedback regarding potential benefits of alternative contract durations or commencement dates. Queries may be submitted by email to emerging.technology.portfolio@westernpower.com.au or via Q&A function in VendorPanel portal. Key activities and dates : Coordinator of Energy to trigger NCESS : 29 August 2024 Call for EOI’s : 4 September 2024 Cut-off date for questions for EOI : 30 September 2024, 5:00PM Closing Date and time for lodgement of EOIs : 7 October 2024, 5:00PM