AUSTRALIA · TENDER

2025 - SOLAR PROJECT

This contract involves the design, supply, fabrication, installation, connection, commissioning, and testing of a grid-connected solar photovoltaic (PV) system. The scope of work includes, but is not limited to: System Capacity Options: Option 1: 110 kW (±0.3 kW) PV array with 100 kW inverter capacity Option 2: 143 kW (±0.3 kW) PV array with 130 kW inverter…

Find your next opportunity

Check scope, work location and the official closing date before shortlisting.

Find similar open tenders

Confirm the actual work location in the procurement documents.

Key facts

Buyer
Rockhampton Girls Grammar School
Buyer address
Rockhampton Girls Grammar School, 155 Agnes St, The Range, Queensland 4700, Australia
Status
Closed
Opened
30 Mar 2025
Closed
22 Apr 2025
Decision
28 Apr 2025
Categories
ELEC, Lighting, Equip & Services, Power Generation, Trans & Distrib.

Summary and scope

This contract involves the design, supply, fabrication, installation, connection, commissioning, and testing of a grid-connected solar photovoltaic (PV) system. The scope of work includes, but is not limited to: System Capacity Options: Option 1: 110 kW (±0.3 kW) PV array with 100 kW inverter capacity Option 2: 143 kW (±0.3 kW) PV array with 130 kW inverter capacity System Monitoring & Data Recording: Integration of system monitoring via Wi-Fi or hardwired communication to enable real-time performance tracking. Import/export metering for each inverter system to record system generation and consumption data for Large-Scale Generation Certificate (LGC) compliance. Electrical & Compliance Requirements: Modifications to the main switchboard and distribution boards as necessary to accommodate the PV system. Obtaining all required approvals from the Distribution Network Service Provider (DNSP) and electricity retailer prior to commencing installation. Contractors must ensure compliance with all relevant standards, regulations, and safety requirements.

Source and freshness

Source update date not provided

Information shown is sourced from public opportunity records. Official buyer documents and addenda take precedence for deadlines, eligibility and submission requirements.