AUSTRALIA · TENDER

T25/26 - FRRE FRE 03 & 06 - Design & Construct CBD Transit Centre & Snow St Pump Stations

🏗️ Tender T25/26: Design & Construct CBD Transit Centre & Snow St Pump Stations Lismore City Council invites tenders for the comprehensive design and construction of two critical flood infrastructure projects: the Snow St Pump Station and the CBD Transit Centre Pump Station Upgrade. This tender falls under the Flood Restoration Portfolio (FRP), aimed at enh…

Key facts

Buyer
Lismore City Council
Location
70 Carrington St Lismore, New South Wales 2480 Australia
Status
Closed
Opened
26 Sept 2025
Closed
20 Nov 2025
Decision
01 Jan 2026
Categories
Construction & Operation, Engineer, Research, Tech services, Utilities, Water & Sewage

Summary and scope

The Snow St pump station will address reliability and operational resilience of Lismore’s flood infrastructure. The Snow St new pump station will improve road inundation in the Industrial Estate and along Three Chain Road. The new pump station and storm water upgrades will provide safer and reliable access to key road networks. The Contractor shall be the Principal Contractor for all design and construction related to the services and works. The Contractor is responsible for all design investigations and detail design elements to achieve Issued for Construction (IFC) drawings and reports. The Contractor shall be responsible for all construction activities as per the IFC drawings and reports. All requirements for the contract works package are within the tender package documents and contract attachments. The Transit Centre Pump Station Upgrade will address the reliability and operational resilience of Lismore’s Flood infrastructure. This upgrade will provide safer and more reliable access to the critical infrastructure which allows the levee pumps to operate for as long as possible during and after a flood event. The Contractor shall be the Principal Contractor for all design and construction related to the services and works for CBD Transit Centre pump station. The Contractor is responsible for all design investigations and detail design elements to achieve Issued for Construction (IFC) drawings and reports. The Contractor shall be responsible for all construction activities as per the IFC drawings and reports. All requirements for the contract works package are within the tender package documents and contract attachments. Please see Scope of Works documents for further details.

Source and freshness

Open buyer portal ↗

Source update date not provided

Information shown is sourced from public opportunity records.