AUSTRALIA · TENDER
Dauan Island PHCC Heating, Ventilation, and Air Conditioning (HVAC) Rectification Project
🌬️ Dauan Island PHCC HVAC Rectification Project (Design & Construct) The Torres and Cape Hospital & Health Service (TCHHS) QLD is seeking a qualified Mechanical Design and Construct (D&C) Contractor for the Dauan Island PHCC Heating, Ventilation, and Air Conditioning (HVAC) Rectification Project. This tender addresses critical upgrades to the existing HVAC…
Key facts
- Buyer
- Torres and Cape Hospital & Health Service QLD
- Location
- 104 Grafton St Cairns City, Queensland 4870 Australia
- Status
- Closed
- Opened
- 16 Oct 2025
- Closed
- 18 Nov 2025
- Decision
- 16 Feb 2026
- Categories
- Building Trade, Repairs, Maint., Mechanical Plant, Equip, Services
Summary and scope
Torres and Cape Hospital and Health Service (TCHHS) has identified that the existing HVAC systems at the Ugar Primary Health Care Centre (PHCC) require upgrades to meet current regulatory standards, address mould issues, and improve fresh air circulation to enhance occupant comfort and safety. This Mechanical Specification, together with the associated drawings, defines the minimum requirements for the plant, equipment, and associated works. It does not represent a complete design. The current design has been developed to approximately 90% completion and is issued for tender on a Design and Construct (D&C) basis. The successful Mechanical D&C Contractor shall be fully responsible for the final design, documentation, Form 15 (Design) certification, supply, delivery, construction, installation, testing, commissioning, Form 16 (Installation) certification, and a 12-month Defects Liability and Maintenance Period.
Source and freshness
Source update date not provided
Information shown is sourced from public opportunity records.